Background
A large-scale data center was undergoing significant expansion to accommodate growing operational demands. During this construction phase, the facility required a reliable temporary power solution to maintain uninterrupted operations while awaiting the installation of permanent power by the utility provider. The client needed a robust, scalable, and dependable power system, along with continuous on-site support to ensure operational continuity.
Challenge
The data center’s expansion project presented several critical challenges:
1. Power Continuity: The facility required a seamless power supply to support critical systems during the construction phase, as any downtime could result in significant operational and financial impacts.
2. Scalable Power Needs: The power solution needed to meet the high energy demands of the data center, which required a capacity of multiple megawatts.
3. Unique Operational Requirements: The client mandated 24-hour on-site technical support to monitor and maintain the temporary power system, ensuring reliability and rapid response to any issues.
4. Logistical Coordination: The installation, operation, and eventual removal of the temporary power equipment needed to be executed with minimal disruption to ongoing construction and data center operations.
Solution
Resilient Energy Solutions designed and implemented a comprehensive temporary power solution tailored to the data center’s needs. The key components of the solution included:
1. Deployment of Generators:
• Five 1-megawatt generators were strategically positioned around the data center to provide a total capacity of 5 megawatts, ensuring sufficient power for critical systems.
• The generators were carefully placed to optimize accessibility, safety, and integration with the facility’s infrastructure.
2. Integration with Client Systems:
• The client’s team connected the generators to the data center’s main power panel, ensuring compatibility with existing electrical infrastructure.
• Resilient Energy Solutions provided technical guidance and support during the integration process to ensure a seamless connection.
3. 24-Hour On-Site Technical Support:
• To meet the client’s requirement for continuous oversight, Resilient Energy Solutions implemented a rotating schedule of 12-hour shifts for on-site technicians.
• Technicians conducted hourly inspections of each generator, monitoring performance metrics such as fuel levels, output, and operational status.
• Detailed logs were maintained and provided to the client, offering transparency and accountability for the temporary power system’s performance.
4. Rapid Deployment and Removal:
• The installation process was executed efficiently, minimizing disruption to the construction site and ongoing operations.
• Upon activation of the permanent power supply by the utility provider, Resilient Energy Solutions performed a swift and organized teardown, removing all equipment and cabling without impacting the data center’s operations.
Execution
The project was executed with precision and coordination:
• Pre-Installation Planning: Resilient Energy Solutions collaborated with the client to assess power requirements, site logistics, and safety protocols. The strategic placement of the generators was planned to ensure accessibility and compliance with site regulations.
• On-Site Operations: The 24-hour technician presence ensured real-time monitoring and immediate response to any potential issues. Hourly checks and detailed logging provided the client with confidence in the system’s reliability.
• Post-Project Teardown: Once permanent power was established, the teardown process was completed efficiently, with all equipment and cabling removed promptly to clear the site for the next phase of construction.
Results
The temporary power solution delivered exceptional outcomes for the client:
• Uninterrupted Operations: The five 1-megawatt generators provided a stable and reliable power supply, ensuring the data center remained fully operational throughout the expansion.
• Client Satisfaction: The client expressed high satisfaction with Resilient Energy Solutions’ performance, citing the reliability of the power system, the professionalism of the on-site technicians, and the seamless execution of the project.
• Operational Transparency: The hourly inspections and detailed logs provided the client with clear visibility into the performance of the temporary power system, fostering trust and accountability.
• Efficient Teardown: The rapid removal of equipment and cabling minimized disruptions and allowed the client to transition smoothly to permanent power.
Key Takeaways
• Customized Solutions: The strategic deployment of five 1-megawatt generators demonstrated Resilient Energy Solutions’ ability to tailor solutions to meet high-capacity power demands in critical environments.
• Reliability and Support: The 24-hour on-site technician presence and hourly monitoring underscored the company’s commitment to reliability and client satisfaction.
• Agility and Efficiency: The rapid deployment and teardown processes Resilient Energy Solutions ability to execute complex projects with minimal disruption.
Conclusion
Resilient Energy Solutions successfully delivered a temporary power solution that met the unique needs of a data center undergoing expansion. By providing reliable power, continuous on-site support, and efficient project execution, the company ensured the client’s operations remained uninterrupted during a critical phase of growth. This case study exemplifies Resilient Energy Solutions expertise in delivering tailored, high-stakes power solutions for mission-critical facilities.